Hydes is the Best Heating and Air Conditioning Company in Palm Desert, CA
At Hydes, we promise the best customer service that will exceed your expectations! We are happy to provide Palm Desert, CA residents with all your heating and cooling repair, installation and replacement, and HVAC maintenance services. Since 1972, thousands of families and business owners have trusted Hydes with their HVAC needs.
Don't trust us, see what your neighbors are saying about our service below! With over 13,000 reviews in Palm Desert we're a family company You Can Trust for your HVAC and Electrical services in Palm Desert.
Get the Best HVAC Service Near You
If your air conditioning unit isn't keeping you cool or you need reliable heating maintenance, call us now at (760) 360-2202! Our certified experts are ready to tackle any issue, no matter your system’s brand, age, or condition. Get 5 Star service and experience comfort with confidence—reach out today.
Recent Review
Just wanted to thank you, and especially Chris. When Chris was out at my neighbors' last Friday, I went over (at 4:45 pm) and told him my split (which your company installed) was not putting out cold AC. I admitted that I had tried to do something with the control the day before and that was very likely the problem. He said he'd be right over when he finished the job he was on.
He came over, quickly fixed my mistake, and reexplained how to work the thing. All very positively and kindly after 5 pm on a Friday. What a guy!!!! Please thank him again.
Carol B., Desert Palms
Residential AC Repair Service in Palm Desert
Hydes offers exceptional air conditioning repair and replacement services to homes in and around Palm Desert, CA. Our expert team is NATE certified and highly trained with experience on all brands of HVAC systems. You can count on us to provide AC repair on any type of cooling unit. We come to your home with loaded trucks, ready to work and get your system running again quickly.
If your system is beyond repair, we also offer new AC installation or replacement service. As a licensed HVAC contractor in California, we are well-equipped to install your new air conditioning, heat pump, or ductless units with expertise and skill, ensuring it lasts you many years to come.
The Power of Ductless Mini-Splits in Palm Desert
Ductless Mini-Splits, unlike traditional HVAC systems, operate without the need for ductwork. This revolutionary design allows for flexible installation, enabling zoned heating and cooling with precision. Unlike traditional HVAC systems, Ductless Mini-Splits offer flexibility in placement. Our HVAC experts can install these units in various locations, optimizing efficiency and aesthetics within your home or garage.
Ductless Maintenance Is Easy
Maintaining your Ductless Mini-Split is a breeze too. Regular filter cleaning and simple check-ups are all that's needed to keep your system running smoothly, contributing to its long lifespan. With SEER (Seasonal Energy Efficiency Ratio) ratings reaching impressive heights, Ductless Mini-Splits are champions in energy efficiency also. Say goodbye to energy wastage and hello to lower utility bills.
Elevate your home comfort with Ductless Mini-Splits from Hydes. Experience the perfect blend of energy efficiency, comfort control, and whisper-quiet operation.
Choosing Your AC Company
When it comes to AC repair, air conditioning system installation, and air conditioner maintenance services in Palm Desert, CA, there are a few things you should keep in mind.
- First, it’s important to find a reputable air conditioning company that is well known and respected in their industry, has great reviews and employs professionally trained HVAC technicians for their work.
- Second, be sure to schedule regular AC maintenance check-ups for your HVAC unit to prevent future problems.
- Third, if you do need air conditioner repair, be sure to get it done as soon as possible to avoid further damage to your air conditioning unit.
By following these simple tips, you can avoid costly AC repairs and keep your home cool and comfortable all summer long.
Heating and Cooling Service FAQs
The average cost of replacing an HVAC or ductless system in Palm Desert ranges from $5,000 to $20,000. The price range is determined by a variety of criteria and options, such as system type, size, energy efficiency, time of year purchased, rebates/incentives, equipment manufacturer and labor/installation costs. If you also need to replace ductwork, you can expect to pay an extra for a single-story 2,200-square-foot home.
The filters and coils of an air conditioner must be maintained on a regular basis in order for the unit to work properly and efficiently during the course of its service life. Ignoring required maintenance results in a gradual deterioration in air conditioning effectiveness while increasing energy consumption.
The most crucial maintenance job for ensuring the effectiveness of your air conditioner is to change or clean its filters on a regular basis. The coils of an air conditioner naturally accumulate dirt over time. A clean filter keeps the coils from becoming too dirty to effectively cool your home. Regular maintenance ensures the filters and coils are clean and performing correctly.
The average household pays between $250 and $600 for AC repair. Pricing for this project varies considerably depending on the issue, part, and complexity of the project. Repairing a malfunctioning thermostat, for example, is likely to be less expensive than repairing a central AC system.
Some advantages of installing a heat pump include being able to cool and heat your home (one unit), consuming less energy by being more efficient than a central AC unit and enhancing your indoor air quality.
On average, indoor air quality testing costs between $250 and $300. Indoor air quality testing may detect the presence of numerous pollutants in your home’s air, such as mold and mildew. Contaminants from chemicals and combustion may also be tested for.
Serving Palm Desert’s Sun City Communities
Palm Desert is home to some of the Coachella Valley’s most well-known 55+ communities, including Sun City Palm Desert and nearby Sun City Shadow Hills. These guard-gated communities feature thousands of single-story homes designed for desert living, golf-cart-friendly streets, and an active lifestyle that depends on reliable indoor comfort year-round.
We regularly serve homeowners in Sun City Palm Desert, one of the largest Del Webb communities in the area, as well as Sun City Shadow Hills just east in Indio. Homes in these neighborhoods require HVAC systems that can handle extreme summer heat, maintain consistent airflow, and operate efficiently to keep monthly energy costs predictable.
As a trusted heating and air conditioning contractor serving Palm Desert, Hydes Air Conditioning understands the construction styles, HVAC layouts, and comfort expectations common in these communities. From fast AC repairs to system replacements and preventative maintenance, our team delivers dependable service tailored to desert homes and the homeowners who live in them.
Your Local HVAC Contractors in Palm Desert
Call (760) 360-2202 to schedule your heating and cooling service in Palm Desert or contact us online with any questions 24 hours a day.
We’d love to earn your business! See what your neighbors are saying about our heating and air conditioning repair services below.
Recent Jobs and Reviews in Palm Desert, CA
Customers say: The overall sentiment across these reviews is overwhelmingly positive, reflecting high levels of customer satisfaction and appreciation. Customers consistently express gratitude for the professionalism, knowledge, and efficiency demonstrated by the service technicians. There is a strong recurring theme of promptness and timeliness, with many reviewers noting quick response times, same-day or next-day appointments, and technicians arriving as scheduled. The technical expertise of the staff is frequently praised, with customers highlighting thorough diagnostics, clear explanations of repairs and options, and problems being resolved quickly and effectively. Interpersonal qualities are also emphasized throughout, with reviewers describing technicians as polite, personable, kind, respectful, and helpful. Many customers appreciate the honest communication and transparency they received regarding their HVAC issues and repair options. The company's reliability is another positive trend, with loyal customers expressing continued trust in the service across multiple properties. Several reviews convey a sense of relief and happiness at having their air conditioning problems resolved efficiently, particularly during extreme heat conditions. The tone is enthusiastic and grateful, with customers feeling well-cared-for and confident in the quality of workmanship and customer service provided.
Our Local Reviews by City
- Banning, CA (1)
- Bardolino, Province of Verona (1)
- Beaumont, CA (1)
- Bermuda Dunes, CA (830)
- Campana, CA (2)
- Cathedral City, CA (1194)
- Cathedral City, California (1)
- Chiriaco Summit, CA (9)
- Coachella, CA (116)
- Coachella, California (1)
- Desert Hot Springs, CA (377)
- Garnet, CA (1)
- Indian Wells, CA (1606)
- Indio, (1)
- Indio, CA (8757)
- Indio, California (2)
- Joshua Tree, CA (2)
- La Quinta, CA (6479)
- La Quinta, California (1)
- Laguna Beach, CA (1)
- London, Greater London (6)
- Los Angeles, CA (3)
- Manchester, CA (1)
- Maricopa, AZ (1)
- Mountain Center, CA (3)
- North Palm Springs, CA (8)
- Palm Desert, CA (16524)
- Palm Springs, CA (2622)
- Palm Springs, California (1)
- Perris, CA (2)
- Phoenix, AZ (2)
- Rancho Cucamonga, CA (1)
- Rancho Mirage, CA (3723)
- Rancho Mirage, California (1)
- San Diego, CA (1)
- San Marcos, CA (1)
- Thermal, CA (9)
- Thousand Palms, CA (264)
- Yucca Valley, CA (3)
Job Locations and Reviews
Diagnostic 2006 equipment for casita. Equipment has major leak in refrigeration system. Equipment is un repairable due to r22 refrigerant coils no longer manufactured.. will schedule to install new ductless mini split for casita. Collected deposit
The installation of a 4-ton Friedrich 14 SEER upflow split heat pump system has been completed. During this process, two original duct runs were replaced to enhance airflow efficiency. Additionally, the ducting transition was corrected, addressing the absence of a proper transition yield (TY) that was previously noted. Furthermore, a four-inch dryer knockdown duct was also repaired. This work contributes to improved heating and cooling performance throughout the system.
Today’s annual cooling preventative maintenance consisted of two package units located on the roof. I first begin with replacing all of the filters throughout the home to ensure that proper airflow is able to circulate back to the system and minimal resistance. I then verified that both of the thermostats are properly calling for cooling and turning the unit on with no errors occurring. All of the cooling sequence of operations are successfully checking out verifying there’s a proper 20° split between each of the supply and returns which ensures that the home is cooling efficiently to the desire temperature the amperage for both of the systems are safely testing out in the correct range ensuring a controlled voltage is being used, and both of these systems are properly draining off the roof to the designated area of the condensation line free of any obstructions. And the coils are also free of any obstructions and debris to ensure proper airflow and circulate. Overall, both of these Am
Excellent
Dripping noise inside master bathroom is not coming from HVAC system. System drains to the opposite side of the noise. could not access area where noise is coming from
After Diagnostic found collapsed return ducting repaired return ducting unit is up and cooling also signed up client on comfort plan
Performed a cooling maintenance on a 2020 American Standard Platinum series condenser, condenser located on right side of home, filter located hallway ceiling, fau located in attic, changed filter, flushed condensation line, on condenser check for amperage and voltage, check for compressor, check for freon level, check if thermostat had no error codes or alerts, everything within range , clear out dust accumulated inside electrical component area and rinsed condenser coil. System is working within specification in cooling at the time of maintenance.
Miguel showed up right on time. He quickly went to work and after he identified the problem went out to his truck and came back with the exact parts we needed. It’s so nice to have the system repaired right away and have the service call completed on a timely manner. Many thanks to Miguel and Hyde’s for keeping us cool and stress free!
Upon arrival client stated system was cooling then stopped then seem to cool a little but still not working. Found system off on error codes. Found error codes 126 which is communication error. Found outdoor unit had 16 volts dc when it needs to be 12 volts dc. Found corroded cap nuts at unit, fix wires and still same error code. Tried extra wire and still same issue. Found cap nuts corroded right by the garage door before wire goes under ground, fixed cap nuts. Same issue occurred. Pulled wire out of wall and found exposed low voltage wires, fixed wires. Same issue occurred. Ran temporary low voltage wires and found 12 volts dc, issue resolved with new low voltage wire. Went to cycle system and found indoor unit off line. Rebooted and found same issue with indoor offline. Removed indoor unit and tried to bring back online however thermostat would not find indoor unit. Factory restored system and thermostat would still not find indoor unit. Found bad circuit board, see corrosion on boa
Today Daniel calling preventative maintenance consisted of two American standard package units. I first began with replacing all of the filter filters to located at the unit one in the home replacing these filters ensure that proper airflow is able to circulate back to the system at minimal resistance. I then verified that the ecobee and the Honeywell thermostat are properly calling for cooling and turning the unit on with no errors occurring. All of the cooling sequence of operations are successfully checking out for both of these systems verifying there’s a proper 20° split between each supply and return which ensures that the home is cooling efficiently to the desire temperature. The coils on the system are free of debris and obstructions, ensuring proper airflow can flow through the system. And both of the condensation lines are draining off the roof to the designated area with no obstructions to the line. The amps and each capacitor are testing out for the correct range on both of
Restrictive metering device. Removed bulb from in side to outside evaporator coil. Temp split now 20’. Cleaned metering device
Upon arrival client stated unit will intermittently cool. Indoor temperature will be at 76° then at random times indoor temp will be at 83°. Found compressor not running at arrival. Condenser fan and blower motors were operational. Tested compressor and found compressor off on an internal thermal switch. Capacitor in range. Advised client of condition of compressor and if issue is reoccurring then signs point towards a failing compressor. Unit is 11 years old. Recommended to client replacement for new warranties and peace of mind. Client requested a phone call to go over pricing. Client to allow system to cool off on its own. Will notify office to schedule phone call for quotes. Replaced Cust supplied 20x36 filter and 12x12 filters. Cleared condensation line. Fau is located in master closet and condenser is located on the roof.
Great job
After Diagnostic found blown high voltage fuse installed fuse unit is up and cooling checked system is running on high amps on compressor we will be installing Thursday the 23 from 9 to 11
Performed a cooling maintenance on 2 2016 Day & Night condenser, condenser located on right side of home, filter located inside filter rack , fau located in garage, changed 2 16x25 filter , flushed condensation line, checked for thermostat on condenser check for amperage and voltage, check for compressor, check for freon level, check for capacitors capacitor were out of range on both condenser advices HO gave me okay to replace both capacitors, check for disconnect box everything within range also clear out dust accumulated inside electrical component area and rinsed condenser coil. System is working within specification in cooling at the time of maintenance.
very good
Replaced capacitors and tested sequence of operation. Equipment is working properly according to manufacturer specifications.
Upon arrival unit was running temperature was set to 78. Thermostat was at 85 after diagnostic found restricted TXV and a dirty coil gonna have office schedule to clean coil and replace TXV and filter dryer system is cooling at this time
Replaced capacitors to master bedroom equipment. Repaired electrical circuit and tested operation
Performed a cooling maintenance on a 2020 American Standard condenser, condenser located on right of home, filter located inside filter rack, fau located in garage, changed 20x25 filter, flushed condensation line, check for thermostat, on condenser check for amperage and voltage, check for compressor, check for freon level topped Freon, check for capacitors, check for disconnect box everything within range also clear out dust accumulated inside electrical component area and rinsed condenser coil. System is working within specification in cooling at the time of maintenance.
Today’s annual cooling preventative maintenance consisted of one American standard unit. I first began with replacing the 24 x 24 filter to ensure that proper airflow is able to circulate back to the system at minimal resistance. I then verified that the thermostat is properly calling for cooling and turning the unit on with no errors occurring. All of the cooling sequence of operations are successfully chucking out verifying there’s a proper 20° split between the liquid line and the suction line which ensures that the home is cooling efficiently to the desired temperature. I then verified that the condensation line is draining properly at this time of service with no obstructions to the line. The amps on the system are safely testing out for the correct rating ensuring a controlled voltage is being used. The coils are free of debris and obstructions to ensure that proper airflow can circulate to the compressor. Overall, this American standard unit is operating to the manufacture specs
Cleaned coil vacuum system unit is up and cooling
Upon arrival, new system outdoor unit non-operational. Indoor unit was only blowing hot air upon further investigation on a blown fuse and disconnect, checked wiring connections and found a loose ground wire tighten up all connections and gave system. A new fuse and system started up and started to cool down the house properly compressor amps and amps are well within range. New system is now cooling down the house properly. Client also has concerns about R 22 system. Client system isn’t keeping up with temperature set inform Client that system needs refrigerant and we do not carry that refrigerant on our trucks. Will send Client an estimate via email if he wants us to add 2 pounds of refrigerant. We will come back and refrigerate.
Installed new warranty motor and check systems. System is operating properly and condenser fan motor is within amp range
Performed annual cooling maintenance on 3) 2022 American Standard Gold heat pumps. FAUs are located in separate attic access in master closet, and two separate roof attic access. Replaced 24x36, 24x24, 2) 12x18, and a custom cut 8x24 filters. Cleared condensation lines from faus. Followed sequence of operations and checked voltage, condenser fan motor amps, compressor start/run amps, capacitor, temperature split, Freon levels, and rinsed condenser coils. Secured all electrical connections. Ecobee thermostats checked out operational. Reset service reminders on thermostats. Systems are working properly in cooling at this time of service. Client opted to wait to schedule heating maintenance at this time.
Upon arrival, Client concerned About system drainage. Check compensation line and inform Client that system is draining properly. System is also cooling down the house properly reaching temperature to 78° inside home Client just wanted to have someone come out to double check inform Client that all is within range.
Upon arrival, client described noise coming from bedroom unit 6926 FAU located inside attic. Turned bedroom unit on and unit would operate but blower motor was causing heat shield to rattle. Insured all screws were tight and noise went away.
Upon arrival client stated they have been out of town and now the ac is not working. Found blown high voltage fuse on one leg. Found only one leg getting power. Found partially tripped breaker. Reset breaker and changed fuse. Cycled system. Advised client on possible weak breaker or surge. Recommend panel tune up or replacement of breaker.
Jonathan did an excellent job. He explained everything I needed to know and took care of the problem. He was also very timely. Thanks, Jonathan!
James was fast & efficient at diagnosing a problem u was having with my A/C. He even noted that the condenser fan motor was under warranty, saving me several hundred dollars. I have always had great experience with Hyde’s!!
Thank you for the wonderful feedback Paul! We're thrilled James could resolve your air conditioning issue quickly and help you save money with that warranty coverage. We truly appreciate your continued trust in Hyde's!
Always on time, very pleasant n good with our golden retriever.
Great service as usual
Low temp split 16 degrees. Odd refrigerant pressure-replaced txv. Now have 20 degrees split. Adjusted refrigerant
The best customer service.
Hyde’s AC is always above the best when it comes to introductions, explanations and service. They’ve been with me for 30 years as long as I’ve owned the condo.
Excellent service! Very knowledgeable and thorough!!
Excellent
Alex is respectful and courteous. He explains everything thoroughly.
Excellent service
He was great. Make sure to give him a raise!!!
Taylor was prompt, professional, efficient, and personable. A pleasure to work with.
Fernanda checked the AC and the mini split. Very helpful with electric question and took photos.
He was very professional and listened to me and answered all my questions in a manner I could understand. W wish all my services call would be answered by someone like Thor.
Thank you so much for the wonderful feedback about Thor! We are thrilled to hear he provided you with professional service and took the time to answer all your questions clearly.
Excellent service
Amador continues to provide excellent customer service
Great service!
Thanks Hyde’s
Miguel came for my regular a/c maintenance. He had great suggestions and answered all my questions. He is very, very nice and does good work.
Excellent Service
Quick arrival, great service
Johnathan was a first class very professional and extremely competent individual. He was friendly and trustworthy . I cannot recommend him enough He did a great job.
I appreciate that they always take the time to explain issues so the customer understands…
I wasn’t there, my tenant said service technician was good.
Brandon quickly examined data from my AC units and found no problems; he switched out our 3 inside filters and sprayed my outside units of debris. He completed the job in less than 30 minutes. My units are good-to-go for another 6 months!
Taylor is the ultimate professional. He knows his stuff, communicates the issues, provides excellent analysis on options and pricing. Made our decisions easy. He is also very likeable. A plus. Their Silver program saved us hundreds of dollars. The Hyde family runs a great service business. I highly recommend Taylor and Hyde.
AC not blowing cold air. It was really hot today. Daniel quickly diagnosed the problem (blown fuse) but stayed on the roof for a long time making sure it would blow again. Thanks Daniel!
Jonathan is always prompt, quick to diagnose a problem and always has a solution. Very personable, helpful and courteous.
Taylor reset my unruly Nest thermostat so it would run at 83 degrees, give or take one degree, when I’m home. He was very helpful in making me more comfortable dealing with the Nest.
Timely, efficient, professional, effective. Hyde’s and their team is tops.
CHRISTOPHER WAS GREAT!!
Excellent response from Hyde’s
I Very professional and explained the problem to us , made adjustments and told us not to worry about losing Freon this time. We will call again if
Very professional
Alex diagnosed & solved our issue quickly; excellent communication. We were having this repair handled remotely & he jumped on a call to keep us informed & resolved the issue.
Thank you for the wonderful feedback about Alex and for taking the time to share your experience with our remote repair service. We truly appreciate your business and are delighted we could resolve your issue efficiently.
Fernanda was tha best technician yet! She even took time to se thermostat with my iPhone which all previous techs couldn’t do. Extremely happy with her!
During our regular pm the tech identified a potential problem with an HVAC component. Maurice followed up and found everything is in working order.
Thor was very thorough and instilled confidence he was handling the service call as needed. Very professional and nice
Craig is a top flight electrician. He also is willing to answer any questions you may have. Additionally, Craig explains clearly what service he is going to perform.
Thank you Cynthia for the wonderful feedback about Craig's electrical expertise and clear communication. We truly appreciate you taking the time to share your positive experience with us. Stay cool 🙂
Prompt Communication was excellent Made sure all work well
Excellent service!
Fast service and knowledgeable, highly knowledgeable staff.
Excellent service
He found the problem and going to fix it at a later date
The service was archaic alerts been from Miguel…. Wonderful, Efficient, Professional, Friendly